PUEBLO OF PICURIS MICROGRID STUDY PORTAL

Request for Proposals (RFP) — Microgrid Study, 2026

RFP Information Portal for Architectural & Engineering (A&E) Services

1. PURPOSE OF THIS PORTAL

This portal serves as the information clearinghouse for the Pueblo of Picuris Microgrid Study Request for Proposals. All materials related to this solicitation — including the RFP document, addenda, questions and answers, and schedule updates — will be posted here so that identical information is made available to every interested party in a timely and consistent manner.

Prospective respondents are responsible for monitoring this portal throughout the solicitation period. No information conveyed through any other channel should be relied upon unless it is subsequently confirmed in writing and posted here.

2. PROJECT OVERVIEW

The Pueblo of Picuris is seeking qualified Architectural and Engineering (A&E) firms to provide engineering design and technical specifications for a hybrid microgrid. The microgrid is anticipated to serve approximately 100 homes, together with administrative and community buildings on Pueblo lands.

The system will be interconnected with Kit Carson Electric Cooperative (KCEC), the host utility serving the Pueblo and the surrounding region. KCEC has been, and continues to be, a partner in the Picuris energy vision and will help guide the design so that the microgrid primarily serves the needs of the Pueblo while providing grid support to KCEC when it is available to do so.

Sandia National Laboratories has historically conducted energy studies for the Pueblo and will continue in an advisory capacity as the microgrid development moves forward.

3. FUNDING AND OVERSIGHT

The study is funded in its entirety by the State of New Mexico through the Energy Conservation and Management Division of the Energy, Minerals and Natural Resources Department (ECMD/EMNRD) under the Grid Modernization Grant Program, November 2025 funding round. The program was established by the Electric Grid Modernization Roadmap Act of 2025 to support grid modernization projects across New Mexico.

Study activities and results will be monitored and reported jointly by ECMD/EMNRD and the Pueblo of Picuris.

4. SOLICITATION STATUS AND SCHEDULE

A Request for Information (RFI) was previously released, and responses were received in April and May of 2026. The RFP was released on August 14, 2026, and is available for download at the link on this page. See the table below for key dates and submittal requirements.

The following schedule applies to this solicitation. Any revision will be posted to this portal.

Item
Detail
Solicitation
Request for Proposals (RFP) — Microgrid Study, 2026
Scope of Services
Architectural & Engineering (A&E) design and technical specifications
Issuing Entity
Pueblo of Picuris
Interconnected Utility
Kit Carson Electric Cooperative (KCEC)
Funding Source
State of New Mexico — ECMD/EMNRD Grid Modernization Grant Program (November 2025 round)
RFP Released

Responses Due

Response Format
August 14, 2026

Friday, October 16, 2026, 5:00 PM MT

Electronic — see RFP for submittal details
Preceding Action
Request for Information (RFI) — responses received April/May 2026

5. INSTRUCTIONS TO INTERESTED FIRMS

  • Check this portal regularly for the RFP release, addenda, and responses to submitted questions.
  • Questions before and after the release of this RFP can be directed to:
    solar@picurispueblo.org
    responses to questions relevant to this solicitation will be posted at this portal with an acknowledgement to the originator of the email.
  • Do not contact Pueblo officials, KCEC staff, or advisory personnel directly regarding this solicitation.

6. POINT OF CONTACT

All inquiries related to this solicitation should be submitted in writing to:

Abbas Akhil

Project Manager, Pueblo of Picuris

Email: solar@picurispueblo.org

Site Tours

The Pueblo of Picuris is hosting guided site tours on Tuesday September 15 and Wednesday September 16 for persons who are considering responding to the microgrid study RFP.

The guided tour(s) will be an opportunity for all parties to familiarize themselves with the Pueblo layout and site conditions. Tour participants will see the existing solar arrays, location of the planned energy storage system and location of the point of interconnection with Kit Carson Electric Co-op. There will be a Q&A session at the conclusion of the tour. Those questions and answers will also be posted at the Picuris Microgrid Portal soon after the conclusion of the tours.

Tour participants can attend either the 15th or 16th or can attend both days at will. The tour will begin at the Picuris Pueblo Administration Building at 10:30am on both days and conclude by 12:30pm, including the Q&A time.

The intended site of the energy storage system and proposed point of interconnection are close to the admin building. The solar array is 2.5 miles from the Administration building on NM 75 and tour attendees must provide their own transportation. Access roads to the admin building and the solar array are paved.

Registration for the guided tours is mandatory. Tour attendees must provide full name, title, company affiliation, phone number, email and attendance date(s) by COB September 11, 2026, to solar@picurispueblo.org

Tour attendance requests will be acknowledged and confirmed.

The Administration building is located at:

201 Pueblo View Road, Penasco, NM 87553

Note: Access to the Pueblo is by Indian Service Rte 201 off of NM 75. The turnoff to Rte 201 is approximately 0.5 miles west of the intersection of NM 75 and NM 76.

Scroll Down for Site Tour Information


DOWNLOAD RFP HERE
MicroGrid Design Study RFP
Tribal Businesses
Thu-Tha Lake
Hotel Santa Fe
Museum Gift Shop
Picuris Travel Center
Picuris Smokes
Recreation Park
Auto Care

Contact Us
Employment Opportunities
Tribal Affairs
Tribal Calendar - to come
Tribal Council
P.O Box 127
201 A Pueblo View Road
Peñasco, New Mexico 87553
(575) 587 - 2519